As a subconsultant, SE3 is responsible for the design and plans of the signing and pavement marking for this project in San Antonio, TX. The project covers about 4 miles of I-35 from I-410 South to I-410 North, including transitions. It involves adding three elevated express lanes in each direction of I-35, with two non-tolled lanes, one non-tolled HOV lane and direct connectors. The estimated construction cost is approximately $700M. As the signing and marking lead, SE3 coordinates closely with the bridge team since all COSS and OSB signs along the express lanes will be attached to the bridge structures.
Construction Cost
$700,000,000
Construction Schedule
Estimated Completion 2027
Client
AECOM/ TxDOT