SE3 was a subconsultant for civil engineering improvements at DFW Airport. The work that we were responsible for comprised a variety of disciplines and work authorizations. This included:
- Design of a new Electrical Vault including structural design of the building and retaining walls, utilities, and stormwater
- Ramp reconstruction at Terminals A&C including pavement and utility removals and design for new water and sanitary extensions at Terminal A
- Glycol System Evaluation; SE3 inspected and televised nearly all the glycol lines within the airport
- Preliminary design of the 19th Street air freight buildings
- North Remote Parking Lot sanitary sewer design and lift station
- Oncor Infrastructure inspection
- Retaining Wall Assessment
- Airfield Blast Wall and Visual Screen Assessments
- Hyatt Regency Parking Garage Ramp Evaluation and Design
Construction Schedule
Ongoing
Consultant Fee
$2,657,000
Client
RS&H/ DFW Airport