SE3 was a subconsultant to AECOM on the High Mast Illumination design of a 5-mile stretch in San Marcos, TX. SE3 was the primary designer of the system including the preparation of the PS&E, and performed the following tasks:
- Used AGI32 software for photometric calculations to determine the ideal lighting design
- Removal of the existing continuous lighting system
- Met with a power company in the field to identify existing power lines and transformers and determine ideal electrical service locations
- Thirty-four high mast poles (150’) were used, with a mixture of type A and type B asymmetric fixtures based on the curvature of the roadway
- Completed FAA obstruction evaluation forms to ensure no conflict with the nearby regional airport
Construction Cost
$2,500,000
Construction Schedule
Completed 2021
Client
AECOM/ TxDOT